WSOC Live Traffic Map
Type
Location
Description
incident
I-77Southbound
Lane blocked due to obstruction on the road on I-77 Southbound at Exit 82A-B-C / US-21 Cherry Rd.
construction
Robert Walker Drboth ways
Road closed due to construction work on Robert Walker Dr both ways from Davidson-Concord Rd to River Crossing Blvd.
construction
7th Stboth ways
Road closed due to the Lovin’ Life Music Festival on 7th St both ways between Caldwell St and Brevard St.
construction
Brevard StWestbound
Road closed due to the Lovin’ Life Music Festival on Brevard St Westbound between 9th St and 7th St.
construction
9th StEastbound
One lane closed due to the Lovin’ Life Music Festival on 9th St Eastbound between Brevard St and Caldwell St.
construction
NC-49Northbound
Lane closed due to construction work on NC-49 Tryon St Northbound at Jeremiah Ave.
construction
8th Stboth ways
Road closed due to the Lovin’ Life Music Festival on 8th St both ways between Caldwell St and Charlotte Rail Trl.
incident
I-85Northbound
Lane blocked due to emergency repairs on I-85 Northbound before Exit 86 NC-47 Belmont Rd.
construction
Caldwell StNorthbound
Two lanes closed due to the Lovin’ Life Music Festival on Caldwell St Northbound between 7th St and 9th St.
construction
I-77Northbound
Lane closed due to construction work on I-77 Northbound from Exit 10 I-277 Brookshire Fwy to Exit 12 Atando Ave.
construction
I-81Northbound
Lane closed due to construction work on I-81 Northbound between I-81 and Exit 35 Whitetop Rd.
construction
I-81Northbound
Lane closed due to construction work on I-81 Northbound in Chilhowie.
construction
VA-80both ways
Intermittent lane closures due to bridge maintenance work on VA-80 both ways between US-11 Lee Hwy and Wayside Ln.
construction
I-81Northbound
Lane closed due to bridge maintenance work on I-81 Northbound between Exit 22 Enterprise Rd and Exit 24 VA-50 Glenbrook Ave.
construction
NC-90both ways
Road closed due to construction work on NC-90 both ways between Anthony Creek Rd and Maple Grove Church Rd.
construction
Bon-Rea Drboth ways
Road permanently closed on Bon-Rea Dr both ways from Arboretum Vw to Swans Run Rd.
construction
Pilgrim Church Rdboth ways
Road closed due to construction work on Pilgrim Church Rd both ways from Fox Mountain Rd to Cheatham Ford Rd.
construction
Flatwood Rdboth ways
Temporary gross weight limit of 40 tons on Flatwood Rd both ways from Bryant Rd to SC-43 Parris Bridge Rd.
construction
Crawford Rdboth ways
Road closed due to bridge maintenance work on Crawford Rd both ways from US-321 York Rd to Ferguson Ridge Rd.
construction
Martin Luther King Jr BlvdEastbound
Lane closed due to construction work on Martin Luther King Jr Blvd Eastbound between Martin Luther King Blvd and Davidson St.
Results20 of 460